Ваше имя:
Ваш телефон: *
Введите код:

НОВЫЙ УРОВЕНЬ БИОЛОГИЧЕСКОЙ ОЧИСТКИ

8 (800) 775-89-69 

 

8 (495) 480-89-69

Power outage protection

SPARTA treatment station has the working part overcapacity exceeding daily output by 2 or 3 times (SPARTA and SPARTA Plus, respectively). Short-term power outages will not affect the station productivity. Removal of sediment from the system is avoided. In this situation, the station will switch to anaerobic operation mode. When power supply is started, the station returns to aerobic cleaning. In case of prolonged power outages, the station can be equipped with uninterruptible power system, which will allow the station to operate in aerobic biological treatment mode with a maximum treatment percentage of up to 5 days.

 
Спарта

ООО "Биоликс" 2019

8 (495) 480-89-69